Kenya Power update 16 counties of a two day power blackout

Due to the ongoing Construction of Lessos- Lanet transmission, Kenya power released a statement on March 26 of a plan to swich off Electricity power on Saturday, March 27 and Sunday, March 28 from 7.00am to 5.00 pm.

A new 220Kv Olakarai-Lessos-Kibos power line is under construction to help create a consistent power supply in the western region.

The statement explained that the power outage is part of government plan to strengthen electricity power supply and infrastructure all over the country.

Among the counties to be affected in rift valley and western region include; Trans-nzoia, Nandi, Elgeyo Marakwet, Uasin Gishu, Kisumu, Kakamega, Busia, Bungoma,Siaya , Migori, Vihiga, Nyamira and Kisii.

KPLC staff at work. Fhoto – File
Share, follow and like Sichwa:

Have a News Tip or an Article? Email us at or
WhatsApp +254751956329.

You can also Join us on Telegram(www.t.me/sichwa) for instant updades on Sichwa Jobs , Sichwa Sports , Sichwa News and Sichwa Posts

Related posts